Electrical power UNITS FOR LIFT TABLE

Energy UNITS FOR LIFT TABLE 1
General Description
This electrical power unit is created exclusively for your smaller lift table,Consisting of large pressure gear pump, AC motor, multi-functional manifold, valves, tank, and so on. This electrical power unit has been broadly utilized within the sector of logistic products which include minifork lift, scissors lift and ariel working platforms. The lower-ing movement is controlled through the solenoid valve with the pace managed by the adjustable needle valve.
Power UNITS FOR LIFT TABLE two
Basic Description
This electrical power unit is intended solely for that medium lift table, Consisting of hugely effecient gear pump, AC motor, multifunctional manifold, valves, tank, ect. The reducing motion is actived by the solenoid valve as well as the speed managed through the adjustable needle valve. Once the lift rises to a large positoin, but the energy supply is minimize, the reducing motion is controlled from the guide override perform.
Power UNITS FOR LIFT TABLE three
Standard Description
This energy unit is developed solely for the big lift table, Consisting of remarkably effecient gear pump, AC motor, multi-functional manifold, valves, tank, ect. The reducing motion is actived from the solenoid valve along with the speed managed by a strain compensated movement management valve.
Electrical power UNITS FOR LIFT TABLE 4
Standard Description
This power unit is designed exclusively for your massive lift table, Consisting of really effecient gear pump, AC motor, multi-functional manifold, valves, tank, ect. The lowering movement is actived by the solenoid valve plus the pace controlled by the adjustable needle valve. Once the lift rises to a high positoin, but the power supply is reduce, the decreasing movement is controlled by the manual override perform.
Exclusive Notes
one. This energy unit is of S3 duty cycle, which might only operate intermittently and repeatedly, i.e. one minute on and 9 minutes off.
2. Clean all the hydraulic parts concerned just before set up of the energy unit.
3. Viscosity of your oil shoud be 15~46 cst,which should really also be clean and free of charge of impurities.N46 hydraulic oil is proposed.
four. Oil altering is required just after the initial one hundred operation hrs,afterwards once each 3000 hrs.
5. The energy unit shown is created to be mounted vertically.

Tags

Recent Posts

worm reducers

As one of leading worm reducers manufacturers, suppliers and exporters of mechanical products, We offer worm reducers and many other products.

Please contact us for details.

Mail: sales@worm-reducers.top

Manufacturer supplier exporter of worm reducers